Detailed design for rehabilitation of pipeline- MWSP "Straldzha" from IS "SREDNA TUNDZHA"

ВС

MWSP "Straldzha" is constructed as a steel pipeline with total length of 4788m, diameter 1400mm and 10atm pressure. The top end of the pipeline is at Gorno Alexandrovo surge chamber, (km 47+8800). The water goes to Gorno Aleksandrovo trough the following facilities:
BINKOS dike, motorway canal M-1, Gorno Alexandrovo pumping station. The objective of the project for reconstruction of the pipeline for irrigation water MWSP "Straldzha" is to solve technically the change of the pipes with fiber glass pipes GRP 1400.

Client: MAF     Closing year: 2004

Gallery

HPIM1122
HPIM1126
HPIM1128
HPIM1130

References

7

FaLang translation system by Faboba