Detailed design for rehabilitation of pipeline- MWSP "Straldzha" from IS "SREDNA TUNDZHA"
MWSP "Straldzha" is constructed as a steel pipeline with total length of 4788m, diameter 1400mm and 10atm pressure. The top end of the pipeline is at Gorno Alexandrovo surge chamber, (km 47+8800). The water goes to Gorno Aleksandrovo trough the following facilities:
BINKOS dike, motorway canal M-1, Gorno Alexandrovo pumping station. The objective of the project for reconstruction of the pipeline for irrigation water MWSP "Straldzha" is to solve technically the change of the pipes with fiber glass pipes GRP 1400.
Client: MAF Closing year: 2004
Gallery
References
Plumbing and pipelines
- General water supply design of town of Dospat, Zmeitsa and Kasaka villages - 26 km
- Detailed design for rehabilitation of Water main - 2 of “STRALDJA” irrigation field part of “SREDNA TUNDJA” irrigation systems
- Sag pipe „Harsovo”
- Pressure pipe BOUHOUDA DN1800 / 6200m
- Detailed design for water catchment and canal "Eni Arch" at Maritsa river
- Detailed design for rehabilitation of pipeline- MWSP "Straldzha" from IS "SREDNA TUNDZHA"