Elatzite hydro transport

Hvostohranilishta

Elatzite hydro transport.
Conceptual design for hydro transport of waste from the ore-dressing plant of site: "BENKOVSKI 2" tailings pond. Project’s purpose - Hydraulic Checks of the Hydraulic Transport System (East and West branches with wastewater pipelines) of the section starting from distribution shaft 3 to the end of the wastewater pipelines; Conceptual design for a new distribution shaft. The performed hydraulic inspection involved the following two possibilities: Verification of the possibility for hydrocycloning on each of the two branches up to elevation 704 and verification of the possibility for a direct in wash of the two branches up to elevation 720.

Contracting authority: Geoproekt Ltd Year of completion: 2015

Tailings ponds and hydro transport