Waste water treatment plants

Pumping station at "Vulkan" factory, Dimitrovgrad

Detailed design for pumping station at "Vulkan" factory, Dimitrovgrad

ПС

The objective is to find technical solution to stop the flow of industrial waters to Maritsa river and to build pumping station for relative clean water which shall be led through a penstock to the existing pumping station for reclaimed water.

The pumping station is at 5.00m distance from the railway operating in the factory as this called for a special construction of the pumping station. The object was put into operation in 2008.

Client: Italcementi group ltd Closing year: 2008

Gallery

HPIM4616
HPIM4617
Picture 025
Picture 029