Intake tunnel of "Chaia" Neykovci dam Tryavna Flood in town of Misia 2000 m3 reservoir Asarel Medet Correction of Lesnovska river Pumping station at "Vulkan" factory, Dimitrovgrad Sag pipe „Harsovo” Luda Yana Dam, Municipality of Panagyurishte Iskretska fishpond Correction of Dobrichka river and its feeders General water supply design of town of Dospat, Zmeitsa and Kasaka villages - 26 km Kalinkite Dam, Municipality of Sandanski Project for Vidin Fishpond "Tsankov Kamuk" tailrace Levka Dam, Municipality of Svilengrad Elatzite hydro transport 9000 m3 compensating basin BIOVET Srechenska Bara Dam, Municipality of Montana "NISA" HPP Hristo Smirnenski Dam, Municipality of Gabrovo "CHAIA" HPP Yovkovtsi Dam, Municipality of Veliko Tarnovo "SEPAREVA BANIA" CASCADE HPP Delvino dam Correction of Tundja river "MUGLA" HPP Correction of Dospat River "DOSPAT 2 " HPP Pressure pipe BOUHOUDA DN1800 / 6200m "DOSPAT 1 " HPP "BANICHAN" WWTP Detailed design for rehabilitation of pipeline- MWSP "Straldzha" from IS "SREDNA TUNDZHA" Detailed design for water catchment and canal "Eni Arch" at Maritsa river River correction of Slatinska river - Sofia Detailed design for rehabilitation of Water main - 2 of “STRALDJA” irrigation field part of “SREDNA TUNDJA” irrigation systems Dolno Kapinovo dam BOUHOUDA Penstock DN1800/6200 m Borovitsa dam Tsankov Kamak reservoir